Back of the Hill station
Preceding station | MBTA | Following station | ||
---|---|---|---|---|
Heath Street Terminus | Green Line | Riverway toward Medford/Tufts |
Location | |
---|---|
Back of the Hill station is a surface stop on the light rail MBTA Green Line E branch, located in the Mission Hill neighborhood of Boston, Massachusetts. It is named after, and primarily serves, the adjacent Back of the Hill apartment complex, a Section 8 development for elderly and disabled residents. Back of the Hill is located on the street running section of the E branch on South Huntington Avenue. The station has no platforms; passengers wait in bus shelters (shared with route 39 buses) on the sidewalks and cross a traffic lane to reach Green Line trains.[2]
History
The Boston Elevated Railway opened streetcar tracks on the newly-laid-out South Huntington Avenue between Centre Street and Huntington Avenue on May 11, 1903. The company began Jamaica Plain–Park Street service via South, Centre, South Huntington, and Huntington as a branch of existing Boston–Brookline service on Huntington Avenue.[3][4]: 61 All Huntington Avenue service (except for Northeastern University and Brigham Circle short turns) operated on South Huntington after September 10, 1938.[5] The line became part of the Metropolitan Transit Authority in 1947, and part of the Massachusetts Bay Transportation Authority (MBTA) in 1967; it was designated as the E Branch of the MBTA Green Line in 1967.[6]
By the 1970s, E Branch trains stopped at Riverway and Heath Street, with no stop between them.[7] The Back of the Hill apartment complex, located just north of Heath Street, was built in 1980 and opened in 1981.[8][9][10] The E Branch was closed for track work from June 21, 1980, to June 26, 1982; trains began stopping at Back of the Hill then or after.[6]
Back of the Hill is the least-used stop on the MBTA subway system, averaging only 35 riders per day by a 2011 count. It was one of only four stops to average fewer than 100 riders per day.[1][note 1] In 2021, the MBTA indicated plans to modify the Heath Street–Brigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations.[11] The new platforms are planned to be long enough to accommodate two 110-foot (34 m) Type 10 vehicles. Design work began in July 2023 and is expected to reach 15% completion in May 2024.[12]
References
- ^ a b "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ "Back of the Hill Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. July 2012.
- ^ "New Route Open". Boston Globe. May 11, 1903. p. 11 – via Newspapers.com.
- ^ Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048.
- ^ Barber, Richard (March–April 1984). "Fifty Years Ago... The Last Days of Cypress Street Carhouse". Rollsign. Vol. 21, no. 3/4. Boston Street Railway Association. pp. 3–7.
- ^ a b Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ Thomas K. Dyer Inc. (1972). "Green Line Station Mileage from Lechmere". Plan for Acquisition and Use of Railroad Rights-of-Way. Massachusetts Bay Transportation Authority.
- ^ Seidman, Karl; Lee, Tunney; Selinger, Elise (April 2016). From Urban Renewal to Affordable Housing Production System: Boston Mayors and the Evolution of Community Development Corporations in Boston (PDF) (Report). Community Innovators Lab, MIT Department of Urban Studies and Planning. p. 39.
- ^ "Back of the Hill Apartments to Remain Affordable for Low-Income Seniors and Disabled Residents" (PDF) (Press release). Massachusetts Housing Finance Agency. November 20, 2006.
- ^ "Mission Hill battle is finally won". Boston Globe. February 15, 1981. p. 35 – via Newspapers.com.
- ^ Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
- ^ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 5.
- ^ The others, as of 2014, are Valley Road (44 riders/day), Capen Street (58 riders/day), and Cedar Grove (91 riders/day), all on the Ashmont–Mattapan High Speed Line.
External links
Media related to Back of the Hill station at Wikimedia Commons
- MBTA - Back of the Hill
- v
- t
- e
- Wonderland
- Revere Beach
- Beachmont
- Suffolk Downs
- Orient Heights
- Wood Island
- Airport
- Maverick
- Aquarium
- State
- Government Center
- Bowdoin
- Oak Grove
- Malden Center
- Wellington
- Assembly
- Sullivan Square
- Community College
- North Station
- Haymarket
- State
- Downtown Crossing
- Chinatown
- Tufts Medical Center
- Back Bay
- Massachusetts Avenue
- Ruggles
- Roxbury Crossing
- Jackson Square
- Stony Brook
- Green Street
- Forest Hills
- Alewife
- Davis
- Porter
- Harvard
- Central
- Kendall/MIT
- Charles/MGH
- Park Street
- Downtown Crossing
- South Station
- Broadway
- Andrew
- JFK/UMass
Ashmont branch | |
---|---|
Braintree branch |
|
Ashmont–Mattapan High-Speed Line |
|
- Kenmore
- Hynes Convention Center
- Copley
- Arlington
- Boylston
- Park Street
- Government Center
- Haymarket
- North Station
- Science Park
- Lechmere
B branch |
|
---|---|
C branch |
|
D branch |
|
E branch |
|